Industry application
Utilities: start with the equipment and maintenance problem.
Project examples include transformer, reactor and electrical-distribution monitoring applications.
Planning questions
What to review before installing sensors
- 01Which equipment, component or route should be monitored?
- 02Which operating states should form the baseline?
- 03Which inspection or condition data can help the team check a change?
- 04Who reviews an alert, and what information is needed before action?
Related projects
Case studies relevant to utilities
These projects show where acoustic monitoring has been used. Results at a new site will depend on its equipment and operating conditions.
utilities
State Grid Xinghua 1000 kV substation
Online acoustic monitoring was used on a 1000 kV main transformer.
Read case study
utilities
State Grid Xingtai 1000 kV substation
Online acoustic monitoring was used with ultra-high-voltage reactor equipment.
Read case study
utilities
Suzhou Wujiang ±10 kV DC distribution station
Online acoustic monitoring and remote review were used with electrical distribution cabinets.
Read case study
Discuss a pilot
Plan a utilities pilot around one type of equipment and one maintenance question.
Share the product or equipment, the target market and the people you want to reach. We will reply with any questions and possible next steps.