Industrial acoustic monitoring in working environments.

These cases show the equipment and applications involved in selected Zhongke Haoyin projects. Results at a new site depend on its equipment, installation and operating conditions.

Project library

12 case studies

Each case describes a specific application. It should not be read as a guarantee of the same result at another site.

wind energy · utilities

National Energy Group Longyuanhe 220 kV wind substation

Operators used acoustic monitoring and sound playback to review transformer condition.

Read case study

utilities

State Grid Xinghua 1000 kV substation

Online acoustic monitoring was used on a 1000 kV main transformer.

Read case study

utilities

State Grid Xingtai 1000 kV substation

Online acoustic monitoring was used with ultra-high-voltage reactor equipment.

Read case study

hydropower

Three Gorges 700 MW hydropower units

Distributed fibre and contact sensors were used to compare normal and unusual sound patterns.

Read case study

hydropower

Chitan hydropower station

The project organized acoustic samples from transformers and reactors for condition review.

Read case study

hydropower

Luojiaohe 10 MW hydropower station

Acoustic monitoring was designed for several types of equipment at the hydropower station.

Read case study

wind energy

National Energy Group Binhai Longyuan wind farm

Local processing and monitoring software connected acoustic data from turbine and transformer locations.

Read case study

wind energy

SPIC Xinjiang Energy Chemical Mulei wind project

The project studied acoustic monitoring for possible wind-blade defects and alerts.

Read case study

power generation

Huaneng Shandong Laiwu power plant

Acoustic monitoring was used with selected rotating equipment at a thermal power plant.

Read case study

mining

Pingshuo coal-preparation conveyor DAS monitoring

Distributed acoustic sensing was used to monitor conveyor operating conditions and locate events.

Read case study

mining

Xinjiang Tianchi Energy conveyor monitoring

Distributed fibre and contact sensors were used at selected conveyor drive locations.

Read case study

utilities

Suzhou Wujiang ±10 kV DC distribution station

Online acoustic monitoring and remote review were used with electrical distribution cabinets.

Read case study

Discuss your application

Have similar equipment? Start with the site conditions and maintenance problem.

A new installation needs its own baseline, test plan and engineering review.