Industry application
Mining: start with the equipment and maintenance problem.
Project examples include conveyors, rollers, drive locations and selected pipeline applications at mining sites.
Planning questions
What to review before installing sensors
- 01Which equipment, component or route should be monitored?
- 02Which operating states should form the baseline?
- 03Which inspection or condition data can help the team check a change?
- 04Who reviews an alert, and what information is needed before action?
Related projects
Case studies relevant to mining
These projects show where acoustic monitoring has been used. Results at a new site will depend on its equipment and operating conditions.
mining
Pingshuo coal-preparation conveyor DAS monitoring
Distributed acoustic sensing was used to monitor conveyor operating conditions and locate events.
Read case study
mining
Xinjiang Tianchi Energy conveyor monitoring
Distributed fibre and contact sensors were used at selected conveyor drive locations.
Read case study
Discuss a pilot
Plan a mining pilot around one type of equipment and one maintenance question.
Share the product or equipment, the target market and the people you want to reach. We will reply with any questions and possible next steps.