Solution · Approved public scope
Hydropower Assets
Apply acoustic monitoring to turbine units, generators, transformers, pumps, pressure-pipe areas and auxiliary equipment.
Adds acoustic visibility across diverse hydropower assets while keeping operators and engineering review in the decision loop.
Asset scope
Start with the physical system.
- Turbine units
- Generators
- Transformers
- Pumps and auxiliary equipment
Evaluation focus
Questions the pilot must answer.
These questions define the review path without presuming a performance result.
- 01
Identify stable operating states and transition conditions.
- 02
Review practical contact and fibre sensing locations.
- 03
Map observations to existing plant and maintenance records.
Related public cases
Application evidence from the authorized source portfolio.
Approved case scope
Three Gorges 700 MW hydropower units
DAS and contact-acoustic monitoring with positive and anomalous signature examples.
Approved case scope
Chitan hydropower station
Acoustic sample categories for transformer and reactor condition review.
Approved case scope
Luojiaohe 10 MW hydropower station
A multi-asset hydropower acoustic-monitoring architecture.
Hydropower Assets pilot
Define what useful evidence would look like for your site.
Share the asset, operating context and maintenance decision you want to improve. We will help frame a practical pilot path.